Full-Scale Building

Overview
As a team of six architecture students, we designed and built a full-scale timber installation for the NTNU campus. Inspired by the surrounding architecture and light conditions, we created a sheltered social space where students could gather between lectures. The concept was first explored through a 1:10 scale model before being developed and constructed at full scale over nine days.
As a team of six architecture students, we designed and built a full-scale timber installation for the NTNU campus. Inspired by the surrounding architecture and light conditions, we created a sheltered social space where students could gather between lectures. The concept was first explored through a 1:10 scale model before being developed and constructed at full scale over nine days.
Role
Role
Role
Architecture
Case
Case
Case
Full scale timber installation
Full scale timber installation
Duration
Duration
Duration
september 2022
Skills
Skills
Skills
Full-scale building
model making
SPatial design









